93 Hatch Blog
Testing antilag…

New motor installed
New motor build… motor assembly.
Pistons in the hole! O-ring installed!
Shannon Gordon making it happen.
New motor build… prepping for bottom end assembly part 1
I got my downpipe, dumptube, manifold, and turbo exhaust housing thermal coated.
Finished up my wiring harness for the most part.
Turbo with the thermal coated exhaust housing.
They powder coated my ECU lid for lulz
Pulled the wirelocks from my old 81mm pistons in prep for the new ones.
New motor build log… collecting parts.
Received my rod bearings and pistons today, ready to go!
GSR transmission getting a ITR LSD installed.
GSR block heading out to GOlden Eagle for sleeving.
Sandblasted valvecover. Ready for AN fittings and powdercoating.
I went thru my harness, cleaning it up, removing unused wired and heat shrinking it all.
Valve cover back from powdercoating, and the 2 -10 AN bungs attached.