New motor build… motor assembly.

Posted by & filed under 93 Hatch Blog.

IMG_0484
Got the right rod bearings!Q\

IMG_0512
Pistons in the hole! O-ring installed!

IMG_0501
Shannon Gordon making it happen.

IMG_0510
Shiny bits!

IMG_0511
Nice and clean.

IMG_0504
Head on, timing belt installed.

IMG_0509
Express delivery thanks again to Shannon.

New motor build… prepping for bottom end assembly part 1

Posted by & filed under 93 Hatch Blog.

IMG_0384
I got my downpipe, dumptube, manifold, and turbo exhaust housing thermal coated.

IMG_0385
Finished up my wiring harness for the most part.

IMG_0386
Turbo with the thermal coated exhaust housing.

IMG_0389
They powder coated my ECU lid for lulz

IMG_0391
Pulled the wirelocks from my old 81mm pistons in prep for the new ones.

IMG_0432
Got the motor on the engine stand.

IMG_0431
Ready to assemble!

IMG_0469
Argh wait nevermind, they sent the wrong rod bearings. Bah.

New motor build log… collecting parts.

Posted by & filed under 93 Hatch Blog.

Received my rod bearings and pistons today, ready to go!
Received my rod bearings and pistons today, ready to go!

IMG_0267
GSR transmission getting a ITR LSD installed.

IMG_0270
84mm 9.5:1 CP Pistons

IMG_0275
GSR block heading out to GOlden Eagle for sleeving.

IMG_0301
Sandblasted valvecover. Ready for AN fittings and powdercoating.

IMG_0361
I went thru my harness, cleaning it up, removing unused wired and heat shrinking it all.

IMG_0363
Valve cover back from powdercoating, and the 2 -10 AN bungs attached.

IMG_0374
Block is back from GE, 84mm bore.

IMG_0376
My daughter likes it!